"While I'm in there" work.
Double-taps, a missing ground, a scorched breaker. You fix it because the cover is already off, and it never makes the invoice.
Service calls, panel upgrades, EV chargers and remodel rough-ins. MotionOps is electrical contractor software that prices the work from your pricebook, gets every change signed before you pull wire and takes the deposit before you order the panel.



The wire you pull is priced. The extras you find, the gear you buy up front and the trip back for the inspector usually aren't.
Double-taps, a missing ground, a scorched breaker. You fix it because the cover is already off, and it never makes the invoice.
The panel, the meter base and the EV charger get ordered before anyone pays. Then the homeowner goes quiet for two weeks.
Something gets missed before the cover goes on. The inspection fails and a truck rolls out again, unbilled.
One house, two changes, two payments. The same four steps run a service call or a remodel rough-in.
A panel upgrade priced from your pricebook, with a surge protector as an option. Karen signs on your phone, you sign, and the 30% deposit is paid before you order the panel.
With the cover off, Andre finds two double-tapped breakers. Then Karen asks for an EV charger circuit. Both changes are priced and signed before the work.
The deposit came in on approval. The balance goes out by payment link the day the job is done.
MotionOps checks hours, materials and payments against the signed scope, then closes the job and syncs it to QuickBooks Online.
Brooks home · Job #4318
Priced right, changed on paper you can defend, paid before the gear is ordered. These are the parts of MotionOps an electrical shop leans on every day.
Panels, breakers, circuits, fixtures and labor, priced once with photos. Every electrician quotes the same panel the same way.
Three EV charger setups on one estimate, plus optional line items like a surge protector. The customer chooses and signs on your phone or from a text.
Found a double-tap or a missing ground? Send a change order with an annotated photo. The customer signs and the new price is on the job.
Templates for panel swaps, EV chargers and service calls. Photos before the cover goes on, so the inspection isn't the first check.
GPS clock-in for each electrician, more than one on an appointment, receipts read by AI receipt capture. Job costing shows the margin while the job is still open.
Take the deposit when the estimate is signed and the balance by card, link or ACH. Pass the card fee to the customer if you choose.
All featuresWe lost $50,000 on a job because our old software didn't support digital contracts. With MotionOps, I can secure customer agreements upfront, eliminating disputes and costly mistakes. It saved our business!

Already on an app for your electrical shop? See how MotionOps compares, feature by feature, with what each tool does well. All comparisons
Pricebook, scheduling and what a smaller electrical shop actually needs, side by side.
MotionOps vs ServiceTitanWhat you keep, what you gain and what switching takes.
MotionOps vs Housecall ProEstimates, change orders and payments on site, side by side.
MotionOps vs FieldPulseService work, projects and setup time, side by side.
MotionOps vs BuildOpsShort answers here. Call us for the long ones.
Yes. Set a deposit on the estimate and it's collected when the customer signs, by card or ACH. The balance goes out as a payment link or is taken on site. Cards are 2.9% + $0.30 per transaction (Amex 3.2% + $0.30). ACH is 1%, or 0.5% at $20,000 and up.
Yes, for service, upgrade and remodel work. Estimates come from your pricebook, with photos, options and optional line items, and the customer signs on your phone or from a link. It isn't a plan takeoff tool for bidding new construction.
Add it to the job as a change order, priced from your pricebook, with photos you can mark up. The customer signs on your phone or from a text, and the new price is on the job before you start.
Yes. Schedule each visit on the same job and put more than one electrician on an appointment when you need to. Hours, photos, changes and payments all stay on that one job.
Yes. Put the work on a service agreement, set the visits to repeat, and charge the card or bank account on file automatically. A customer with several buildings can have several service addresses. Recurring jobs and auto-charging come with the Go plan and up.
It's built for the truck: GPS clock-in, the day's jobs, checklists, photos and payments, on iOS and Android, in English or Spanish, at no extra cost.
Yes, with QuickBooks Online (sold separately). MotionOps syncs clients, products and services, invoices, payments, refunds, tips and payouts. You choose what syncs, drafts stay out, and a sync log shows every change.
See MotionOps run one of your own panel upgrades, from the estimate to paid and closed.
Rather talk now? (855) 739-1133