Paving contractor software that prices the surprise before the base goes down.
Asphalt driveways, parking lots, overlays and patching. MotionOps is paving contractor software that turns a measure into a signed proposal, takes the deposit on approval and gets every base repair signed before the paver rolls.

Here's how a paving job runs in MotionOps.
One long driveway, two days, one crushed culvert under the apron. The same four steps run a patch job or a church parking lot.
- 1
Sign it
A measured proposal from your pricebook: tear-out, a new stone base and 2.5 inches of asphalt, with sealcoating the side pad as an option. Heather picks it, signs on her phone, you sign too, and the 30% deposit is captured on approval.
- 2
Change it
Tear-out finds the culvert under the apron crushed flat. Your foreman photographs it, writes the replacement as a change order, and Heather signs before the base goes down. She drops the sealcoat on the side pad, and that gets signed too.
- 3
Get paid
The deposit by card on approval, the final balance by ACH from a payment link the day the roller leaves. Every payment lands on the job.
- 4
Close it
MotionOps checks hours, materials and money against the signed scope. When it all matches, the job closes and syncs to QuickBooks Online.
Asphalt driveway replacement
Sorensen residence · Job #3213
- Proposal signed by both sides
- Both change orders signed
- Culvert photos on the job
- Collected matches approved scope
Scheduling is my favorite feature of MotionOps. It's so easy to see who's available quickly and assign jobs, which saves us hours every single day. We love how you can make draft appointments and when you're happy with the routes, publish all those appointments and the people on the field get notified about the updates.

Switching from something else?
Already on another app for your paving jobs? See how MotionOps compares, feature by feature, with what each tool does well. All comparisons
Measured proposals, job costing and draws, side by side.
MotionOps vs JobTreadChange orders, progress billing and setup time, side by side.
MotionOps vs BuildertrendChange orders, crews and progress payments, side by side.
MotionOps vs JobberKeep QuickBooks for the books. Run the proposals, crews and draws in MotionOps.
MotionOps + QuickBooksWhat switching takes
- A call about your businessTell us how you run a paving job today. A real person shows you MotionOps on one of your own jobs.
- Your lists, brought overWe help you move your customers and your pricebook.
- Your next job in MotionOpsMeasure it, sign it, pave it and get paid, with someone setting you up.
Questions paving contractors ask us.
Short answers here. Call us for the long ones.
Yes. Build the proposal from your pricebook with fixed, hourly or blended labor and materials fixed or cost-plus. Add photos of the old surface and options like sealcoating or a wider apron, and the customer picks before they sign.
Yes. Capture the deposit when the proposal is approved, by card or ACH. Cards are 2.9% + $0.30 per transaction (Amex 3.2% + $0.30). ACH bank payments are 1%, or 0.5% at $20,000 and up.
Your foreman starts a change order on site, with photos and items from your pricebook. The customer signs on the crew's phone or from a link before the base goes down, and the new price is on the job.
Yes. Take a deposit on approval, send draws as each phase is done, like milling or the base course, then the final balance. Customers see and pay every invoice in the customer portal.
Yes. Put the job on as many days as it needs, with several people on each visit. Each one clocks in with GPS, and Work, Break and Driving time land on timesheets you approve.
Yes, with QuickBooks Online (sold separately). MotionOps syncs clients, products and services, invoices, payments, refunds, tips and payouts. You choose what syncs, drafts stay out, and a sync log shows every change.
See MotionOps run
a job from your trade.
Bring one of your own jobs. We'll run it from signed to closed and paid.
Rather talk now? (855) 739-1133