Carpentry contractor software that gets every change signed before the first cut.
Trim, built-ins, coffered ceilings, stairs and custom millwork. MotionOps is carpentry contractor software that turns a measure and a drawing into a signed proposal, takes the deposit before you buy lumber and bills your hours and materials against the job.

Here's how a carpentry job runs in MotionOps.
One dining room, eight days, one ceiling that wasn't level. The same four steps run a single doorway of trim or a house full of built-ins.
- 1
Sign it
A proposal from your pricebook with the drawing, the wood species and an optional window seat. The homeowner approves on their phone, you sign too, and the 40% deposit is captured before you buy the lumber.
- 2
Change it
Layout day shows the ceiling is 1 1/4 inches out of level across the room. Your lead photographs it, adds furring as a change order and the homeowner signs before the beams go up. They switch the wainscot to paint-grade, and that gets signed too.
- 3
Get paid
The deposit by ACH, a draw when the ceiling grid is up, the final balance by payment link after the last nail hole is filled. Every payment lands on the job.
- 4
Close it
MotionOps checks hours, materials and money against the signed scope. When it all matches, the job closes and syncs to QuickBooks Online.
Coffered ceiling and wainscot
Raman residence · Job #3205
- Proposal signed by both sides
- Both change orders signed
- Lumber and hours invoiced
- Collected matches approved scope
Scheduling is my favorite feature of MotionOps. It's so easy to see who's available quickly and assign jobs, which saves us hours every single day. We love how you can make draft appointments and when you're happy with the routes, publish all those appointments and the people on the field get notified about the updates.

Switching from something else?
Already on another app for your carpentry jobs? See how MotionOps compares, feature by feature, with what each tool does well. All comparisons
Change orders, draws and setup for a smaller crew, side by side.
MotionOps vs BuildertrendJob costing, materials and progress payments, side by side.
MotionOps vs JobTreadProposals with drawings, signed agreements and getting paid, side by side.
MotionOps vs Houzz ProChange orders, progress payments and multi-day jobs, side by side.
MotionOps vs JobberWhat switching takes
- A call about your businessTell us how you run a carpentry job today. A real person shows you MotionOps on one of your own jobs.
- Your lists, brought overWe help you move your customers and your pricebook.
- Your next job in MotionOpsPrice the custom work, sign every change and get paid, with someone setting you up.
Questions carpenters ask us.
Short answers here. Call us for the long ones.
Yes. Your pricebook holds linear-foot trim, per-piece items like doors and newel posts, and hourly labor. Use fixed, hourly or blended labor on the same proposal, and attach your drawings and photos.
Yes. Capture the deposit when the proposal is approved, by card or ACH, then send draws as the work goes up. Cards are 2.9% + $0.30 per transaction (Amex 3.2% + $0.30). ACH bank payments are 1%, or 0.5% at $20,000 and up.
Log materials to the job at cost and bill them cost-plus with your markup. Job costing shows hours, materials and money against the signed scope while the job is still open.
Your lead starts a change order on site with photos and items from your pricebook, like furring or scribing. The homeowner signs on the crew's phone or from a link before you cut, and the signed change becomes the new agreed price.
Yes. Put the job on as many days as it needs, with more than one carpenter on each visit. Each one clocks in with GPS, and hours land on the job and on timesheets you approve.
Yes, with QuickBooks Online (sold separately). MotionOps syncs clients, products and services, invoices, payments, refunds, tips and payouts. You choose what syncs, drafts stay out, and a sync log shows every change.
See MotionOps run
a job from your trade.
Bring one of your own jobs. We'll run it from signed to closed and paid.
Rather talk now? (855) 739-1133