Chimney sweep software that turns inspection photos into a signed repair.
Sweeps, inspections, caps and crowns, liners and masonry repair. MotionOps is chimney sweep software that puts your inspection photos on the job, gets the repair signed before you climb back up, and collects the deposit before you order the liner.

Here's how a chimney reline runs in MotionOps.
One sweep, one bad flue, two changes. The same four steps run a single sweep or a full rebuild.
- 1
Sign it
The sweep turns up cracked flue tiles. Kofi shows Paul the photos and prices a stainless liner and cap from your pricebook, with a top-sealing damper as an option. Paul takes the damper and signs on Kofi's phone, you sign too, and the 40% deposit is captured before the liner is ordered.
- 2
Change it
On install day the crown is cracked through. Kofi adds a crown rebuild with photos, and Paul signs before the mortar is mixed. To cover it, Paul drops the damper, and that's signed too.
- 3
Get paid
The deposit came in on approval. The balance goes out by payment link the day the liner is in, and Paul pays it by ACH.
- 4
Close it
MotionOps checks the checklist, the changes and the payments against the signed scope. Then it closes the job and syncs it to QuickBooks Online.
Stainless liner + cap
Lindgren residence · Job #3219
- Proposal signed by both sides
- Both change orders signed
- Flue photos before and after
- Collected matches approved scope
Scheduling is my favorite feature of MotionOps. It's so easy to see who's available quickly and assign jobs, which saves us hours every single day. We love how you can make draft appointments and when you're happy with the routes, publish all those appointments and the people on the field get notified about the updates.

Switching from something else?
Already on another app for your chimney jobs? See how MotionOps compares, feature by feature, with what each tool does well. All comparisons
Inspections, repair estimates and payments, side by side.
MotionOps vs Housecall ProQuotes with photos, yearly sweeps and the crew app, side by side.
MotionOps vs JobberService calls, repairs sold on site and getting paid, side by side.
MotionOps vs WorkizEstimates, deposits and job costing, side by side.
MotionOps vs Service FusionWhat switching takes
- A call about your businessTell us how you run a chimney job today. A real person shows you MotionOps on one of your own jobs.
- Your lists, brought overWe help you move your customers and your pricebook.
- Your next job in MotionOpsSweep it, price the repair, get paid and close it, with someone setting you up.
Questions chimney sweeps ask us.
Short answers here. Call us for the long ones.
Yes. Photos from the sweep land on the job. Build the repair proposal from your pricebook with those photos attached, and the homeowner signs on your phone or from a link.
Yes. Capture the deposit when the proposal is approved, by card or ACH. Cards are 2.9% + $0.30 per transaction (Amex 3.2% + $0.30). ACH bank payments are 1%, or 0.5% at $20,000 and up.
Record it with a job waiver. Add photos of the problem, like cracked flue tiles, and the homeowner signs that they declined the repair against your recommendation. It stays on the job.
Yes. Build a checklist for each job type, like a sweep or a Level 2 inspection, and make items require a photo or a signature. MotionOps won't close the job while a required item is open.
Yes. Make it a recurring job with one visit a year and invoice after each visit. The card on file can be charged automatically when the sweep is done.
Yes, with QuickBooks Online (sold separately). MotionOps syncs clients, products and services, invoices, payments, refunds, tips and payouts. You choose what syncs, drafts stay out, and a sync log shows every change.
See MotionOps run
a job from your trade.
Bring one of your own jobs. We'll run it from signed to closed and paid.
Rather talk now? (855) 739-1133