Flooring contractor software that prices every room and what's under it.
Hardwood, LVP, laminate, carpet and refinishing. MotionOps is flooring contractor software that turns a measure into a signed square-foot proposal, takes the deposit before you order material and gets subfloor repairs signed before the first plank goes down.

Here's how a flooring job runs in MotionOps.
One house, three days, one dip in the hallway nobody saw under the carpet. The same four steps run a single room or a whole floor.
- 1
Sign it
A square-foot proposal from your pricebook: LVP, carpet tear-out, transitions and quarter round, with photos of every room. The homeowner approves on their phone, you sign too, and the 50% deposit is captured before you order the plank.
- 2
Change it
Tear-out shows the hallway subfloor dips 3/8 inch. Your installer photographs it, adds leveling as a change order and the homeowner signs before the first plank goes down. They keep the carpet in the primary bedroom, and that gets signed too.
- 3
Get paid
The deposit by card on approval, the final balance by payment link the day the last transition goes in. Every payment lands on the job.
- 4
Close it
MotionOps checks hours, materials and payments against the signed scope, then closes the job and syncs it to QuickBooks Online.
LVP install, 1,150 sq ft
Robinson residence · Job #3202
- Proposal signed by both sides
- Both change orders signed
- Subfloor photos on the job
- Collected matches approved scope
Scheduling is my favorite feature of MotionOps. It's so easy to see who's available quickly and assign jobs, which saves us hours every single day. We love how you can make draft appointments and when you're happy with the routes, publish all those appointments and the people on the field get notified about the updates.

Switching from something else?
Already on another app for your flooring jobs? See how MotionOps compares, feature by feature, with what each tool does well. All comparisons
Square-foot proposals, job costing and payments, side by side.
MotionOps vs JobTreadProposals, signed agreements and getting paid, side by side.
MotionOps vs Houzz ProSquare-foot estimates, deposits and multi-day jobs, side by side.
MotionOps vs JobberEstimates, deposits and installer timesheets, side by side.
MotionOps vs Housecall ProWhat switching takes
- A call about your businessTell us how you run a flooring job today. A real person shows you MotionOps on one of your own jobs.
- Your lists, brought overWe help you move your customers and your pricebook.
- Your next job in MotionOpsMeasure it, price it by the square foot and get paid in full, with someone setting you up.
Questions flooring contractors ask us.
Short answers here. Call us for the long ones.
Yes. Build the proposal from your pricebook with square-foot items for each room, plus tear-out, stairs, transitions and trim. Add photos and optional upgrades, and the homeowner picks what they want before they sign.
Yes. Capture the deposit when the proposal is approved, by card or ACH, so the material is paid for before you order it. Cards are 2.9% + $0.30 per transaction (Amex 3.2% + $0.30). ACH bank payments are 1%, or 0.5% at $20,000 and up.
Your installer starts a change order on site with photos and items from your pricebook, like leveling compound or a new sheet of plywood. The homeowner signs on the installer's phone or from a link, and the new price is on the job before you keep going.
Record it with a job waiver. Attach photos of the moisture readings, and the homeowner signs that they're going ahead against your recommendation.
Yes. Each installer clocks in with GPS and tracks Work, Break and Driving time. Hours land on the job and on timesheets you approve, so you see what a three-day install really cost in labor.
Yes, with QuickBooks Online (sold separately). MotionOps syncs clients, products and services, invoices, payments, refunds, tips and payouts. You choose what syncs, drafts stay out, and a sync log shows every change.
See MotionOps run
a job from your trade.
Bring one of your own jobs. We'll run it from signed to closed and paid.
Rather talk now? (855) 739-1133