Skip to content
Black Friday

50% off any plan for 6 months. Free data migration and setup. Ends Nov 30.

Claim the deal Claim the Black Friday deal

Roofing contractor software that prices the rotted decking before the shingles go on.

Reroofs, tear-offs, repairs and gutters. MotionOps is roofing contractor software that turns a roof inspection into a signed proposal, takes the deposit before you order material and gets every sheet of extra decking signed before it goes down.

Deposit before material dropsExtra decking signed firstA real person sets you up
A roofer in a hi-vis shirt fastening shingles with a power drill

Here's how a reroof runs in MotionOps.

One house, two days, nine sheets of soft decking under the old shingles. The same four steps run a leak repair or a full tear-off.

  1. 1

    Sign it

    A proposal from your pricebook, priced by the square, with photos from the roof and a per-sheet price for any rotted decking. The homeowner approves on their phone, you sign too, and the 30% deposit is captured on approval.

  2. 2

    Change it

    Tear-off finds nine sheets of rotted decking over the back porch. Your foreman photographs them, adds them as a change order and the homeowner signs before the new sheets go down. They decide to keep the old skylight, and that change gets signed with a waiver.

  3. 3

    Get paid

    The deposit by card on approval, the final balance by payment link the day the dumpster leaves. Every payment lands on the job.

  4. 4

    Close it

    MotionOps checks hours, materials and payments against the signed scope, then closes the job and syncs it to QuickBooks Online.

Book a demo How change orders work
app.motionops.com/jobs/3206

Asphalt reroof, 28 squares

Martinez residence · Job #3206

Signed
Proposal + service agreement · v1
ScopeTear-off, 28 squares, architectural
Deposit on approval30% · $4,560
GM
Gloria MartinezCustomer · signed Nov 7
CH
Cody HarmonContractor · signed Nov 7
Agreed price$15,200
Change orders
CO-1
Replace rotted decking, 9 sheetsPhotos attached · signed Nov 18
+$855
CO-2
Keep the existing skylightWaiver signed · Nov 18
−$680
New agreed price$15,200$15,375
Payments
Deposit · card$4,560
Final balance · payment link$10,815
Collected vs. approved scope$15,375 of $15,375
Close checks
  • Proposal signed by both sides
  • Both changes and the waiver signed
  • Tear-off and decking photos on the job
  • Collected matches approved scope
Job closed and synced to QuickBooks Online

Scheduling is my favorite feature of MotionOps. It's so easy to see who's available quickly and assign jobs, which saves us hours every single day. We love how you can make draft appointments and when you're happy with the routes, publish all those appointments and the people on the field get notified about the updates.

Brian WestAccount Manager, Cransten: Handyman and Remodeling
4.7
On the App Store12 ratings, as of Nov 2026
G2 High Performer badge
High Performer on G2Field service management
A real person sets you upOnboarding on every plan

Switching from something else?

Already on another app for your roofing jobs? See how MotionOps compares, feature by feature, with what each tool does well. All comparisons

What switching takes

  • A call about your businessTell us how you run a roofing job today. A real person shows you MotionOps on one of your own jobs.
  • Your lists, brought overWe help you move your customers and your pricebook.
  • Your next job in MotionOpsPrice the roof, sign the extra decking and collect the balance, with someone setting you up.
Book the call Or start with the MotionOps + QuickBooks setup.

Questions roofing contractors ask us.

Short answers here. Call us for the long ones.

Still have a question?Call (855) 739-1133 or book a demo. A real person will walk you through it.

Yes. Put per-square shingles, per-sheet decking, linear-foot drip edge and flat-rate items like pipe boots in your pricebook. Add photos from the roof and optional upgrades, and the homeowner picks before they sign.

Yes. Capture the deposit when the proposal is approved, by card or ACH, and send the balance by payment link when the job is done. Cards are 2.9% + $0.30 per transaction (Amex 3.2% + $0.30). ACH bank payments are 1%, or 0.5% at $20,000 and up.

Your foreman starts a change order on the roof with photos and the per-sheet price from your pricebook. The homeowner signs on the crew's phone or from a link before the new decking goes down, and the signed change becomes the new agreed price.

No. MotionOps doesn't do aerial measurements or insurance paperwork. Bring your own measurements, and MotionOps runs the rest: proposals, deposits, change orders, crews, invoices and payments.

Yes. Put the job on both days with your whole crew on each visit, publish it and everyone is notified. The homeowner gets an On My Way text, and each roofer's hours land on the job and on timesheets you approve.

Yes, with QuickBooks Online (sold separately). MotionOps syncs clients, products and services, invoices, payments, refunds, tips and payouts. You choose what syncs, drafts stay out, and a sync log shows every change.

See MotionOps run
a job from your trade.

Bring one of your own jobs. We'll run it from signed to closed and paid.

1:1 onboarding on every planWe move your data for youA real person, not a ticket

Rather talk now? (855) 739-1133

Book a 20-minute demoPick a time. Our team will show you MotionOps on your kind of jobs.

Before you go

Rather have us call you?

Leave your name, number and a good time. We’ll call, show you around and answer your questions.

Get in touch

Questions about MotionOps, your account or a partnership. A real person reads every message.

Rather talk? (855) 739-1133 · Help center