Tile contractor software that puts the waterproofing on record before it's tiled over.
Showers, floors, backsplashes and tub surrounds. MotionOps is tile contractor software that turns a measure into a signed square-foot proposal, takes the deposit before you order tile and keeps photos of every layer of prep on the job.

Here's how a tile job runs in MotionOps.
One bathroom, six days, one wet wall behind the old surround. The same four steps run a backsplash or a whole floor.
- 1
Sign it
A proposal from your pricebook, priced by the square foot for walls and floor, with tile choices and an optional bench. The homeowner approves on their phone, you sign too, and the 40% deposit is captured on approval.
- 2
Change it
Tear-out finds soaked drywall behind the old tub surround. Your setter photographs it, adds cement board as a change order and the homeowner signs before the first tile goes up. They drop the mosaic accent stripe, and that gets signed too.
- 3
Get paid
The deposit by card, a draw by ACH once the shower pan passes the flood test, the final balance by payment link after grout and caulk. Every payment lands on the job.
- 4
Close it
MotionOps checks hours, materials and payments against the signed scope, then closes the job and syncs it to QuickBooks Online.
Shower and floor tile
Kowalski residence · Job #3203
- Proposal signed by both sides
- Both change orders signed
- Membrane and flood test photos
- Collected matches approved scope
Scheduling is my favorite feature of MotionOps. It's so easy to see who's available quickly and assign jobs, which saves us hours every single day. We love how you can make draft appointments and when you're happy with the routes, publish all those appointments and the people on the field get notified about the updates.

Switching from something else?
Already on another app for your tile jobs? See how MotionOps compares, feature by feature, with what each tool does well. All comparisons
Proposals, signed agreements and getting paid, side by side.
MotionOps vs Houzz ProSquare-foot proposals, job costing and draws, side by side.
MotionOps vs JobTreadSquare-foot estimates, deposits and multi-day jobs, side by side.
MotionOps vs JobberEstimates, job photos and getting paid, side by side.
MotionOps vs Housecall ProWhat switching takes
- A call about your businessTell us how you run a tile job today. A real person shows you MotionOps on one of your own jobs.
- Your lists, brought overWe help you move your customers and your pricebook.
- Your next job in MotionOpsPrice it by the square foot, photograph the prep and get paid, with someone setting you up.
Questions tile contractors ask us.
Short answers here. Call us for the long ones.
Yes. Build the proposal from your pricebook with square-foot items for walls, floors and backsplashes, plus line items for pans, niches, benches and trim pieces. The homeowner picks optional items before they sign.
Yes. Capture the deposit when the proposal is approved, by card or ACH, and send a draw once the waterproofing is done. Cards are 2.9% + $0.30 per transaction (Amex 3.2% + $0.30). ACH bank payments are 1%, or 0.5% at $20,000 and up.
Yes. Set up a checklist for shower jobs with items that require a photo, like the membrane and the flood test. Mandatory items block closing, so no shower job closes without them.
Your setter starts a change order on site with photos and items from your pricebook, like cement board or a new pan. The homeowner signs on the setter's phone or from a link before the work, and the signed change becomes the new agreed price.
Record it with a job waiver. It shows the issue with photos, like a floor that flexes without an uncoupling membrane, and the homeowner signs it as against your recommendation.
Yes, with QuickBooks Online (sold separately). MotionOps syncs clients, products and services, invoices, payments, refunds, tips and payouts. You choose what syncs, drafts stay out, and a sync log shows every change.
See MotionOps run
a job from your trade.
Bring one of your own jobs. We'll run it from signed to closed and paid.
Rather talk now? (855) 739-1133